Size a home backup battery around an explicit list of essential loads and an outage duration. Your monthly electric bill can describe historical energy use, but it does not reveal simultaneous startup demand or prove that one portable station can support the whole house.
Separate plug-in and installed systems
A portable station may serve compatible cord-connected appliances within its output and outlet limits. Hardwired equipment, household circuits and 240 V loads need a different compatibility and installation assessment. A 120 V output is not a substitute for a 240 V supply. Home battery installation, transfer equipment, permits and locally adopted electrical requirements need a qualified installer.
Create an essential-load worksheet
For each appliance, record quantity, real running input W, total on-time, startup requirements, voltage and whether it may run with the others. Use an energy meter or qualified measurement where appropriate. For cycling loads, keep instantaneous watts separate from average energy over time.
Invented calculation example: four 9 W lights used for 5 hours consume 180 Wh. A 15 W router for 12 hours consumes another 180 Wh. A hypothetical measured refrigerator load of 100 W for 4 total compressor-on hours adds 400 Wh, excluding any unlisted defrost or standby demand. The listed energy is 760 Wh and simultaneous running load is 151 W. These assumptions are incomplete for a real refrigerator; they demonstrate arithmetic only.
How much battery does that mean?
The 760 Wh total is device energy, not a nominal battery recommendation. Required battery capacity also depends on applicable conversion efficiency, inverter idle draw, usable discharge window, initial charge, temperature and aging. If using measured usable AC energy, avoid counting the same conversion loss twice. Add a capacity allowance only with a stated reason; no universal percentage is a code-approved home sizing factor.
Keep a separate startup scenario. If loads can restart together after an outage, a “largest motor only” assumption may be unsuitable. A station may pass the energy screen and still fail to start a motor.
Choose the next decision
For a small set of plug-in loads, compare the US power-station records after building your plan. For a sump pump, use pump-specific sizing and dedicated backup options. The refrigerator guide covers that load in more detail.
Calculate separate short and long outage plans in the Backup Power Map. Do not assume solar recharging unless you have a defensible generation estimate for the period. Sources: EIA’s energy units and Victron’s inverter selection guidance. This worksheet is not an NEC service or branch-circuit load calculation.